Antalya, known as Turkey's tourism capital, is preparing for a major transport transformation. Rapid population growth, which exceeded 2.7 million people in the province by 2024, and a record 16.5 million foreign tourists in 2023 are creating enormous pressure on urban infrastructure. To meet this challenge, local authorities and state operators have launched several key projects that will change the city's face in the coming years and decades.
Transport projects Antalya future Urban development RestProperty
In this article, we will break down the main transport initiatives: from an ambitious 25-year airport expansion plan to long-awaited railway routes and the updated urban transport strategy up to 2040.
What you will learn from this article
• Airport expansion: from regional hub to global gateway
• High-speed rail: connecting Antalya to the world
• 2040 Urban Transport Master Plan
• Challenges and opportunities
• What this means for investors
• Key takeaways
1. Antalya Airport: From Regional Hub to Global Gateway
The region's main air gateway is undergoing the most extensive reconstruction in its history. The project, implemented by the Fraport TAV consortium, is divided into three phases and is planned until 2039.
Completed: First Phase (2022–2025)
Key expansion works were carried out between 2022 and 2025. The area of International Terminal T2 increased from 89,000 to 225,000 m², and Domestic Terminal T4 — from 37,000 to 75,000 m². Annual airport capacity grew from 35 to 82 million passengers. The number of air bridges increased from 20 to 38, and aircraft parking positions — from 108 to 176.
Second Phase (2028–2029)
Plans include the completion of a new control tower and further expansion of apron areas. These works will solidify the airport's status as one of the largest hubs in the Mediterranean.
Third Phase (2038–2039)
The most ambitious stage includes the construction of a completely new international terminal T3 with an area of about 70,000 m². This will increase passenger traffic to over 80 million people per year, providing a buffer for decades to come.
In 2025, the airport served a record 39.1 million passengers, and a new peak is expected in 2026. Airport development directly stimulates tourism and makes the region more attractive for investors.
2. Long-Awaited Railway: High-Speed Trains Connecting Antalya to the World
One of the most discussed topics is the return of rail service to Antalya, which was interrupted decades ago. Two key projects are currently on the agenda:
High-Speed Line: Antalya–Afyonkarahisar–Eskişehir
This project aims to connect Antalya to the country's high-speed network and, ultimately, to Istanbul. The route will pass through the provinces of Isparta and Burdur, significantly reducing travel time for passengers and freight.
Tourist Line: Manavgat–Konya
The second project is aimed at creating a direct tourist route connecting the resort region of Manavgat with Konya and further with Cappadocia. This will open up new opportunities for tourism, allowing travelers to easily combine beach holidays with cultural excursions.
The implementation of these projects has historically faced serious obstacles, the main one being the Taurus Mountains, which create difficult construction conditions. However, modern technology and political will give hope that in the coming decades Antalya will finally receive the long-awaited rail connection.
3. Urban Mobility: 2040 Ulaşım Ana Planı (Transport Master Plan)
Alongside large-scale national projects, city authorities are working on a detailed plan for the development of intra-city transport. The main goal is to make public transport more attractive and relieve roads of cars. Key strategies include:
- Creating "transport spines" of rapid transit lines (possibly light rail or metrobus) that will handle the bulk of passenger traffic on the busiest routes.
- Developing transfer hubs (Transfer Merkezleri) where passengers can easily transfer from private vehicles or intercity buses to urban public transport.
- Promoting eco-friendly transport — development of cycling and pedestrian infrastructure.
The current tram network (AntRay), consisting of two lines, already connects the city center with the airport and eastern districts. The 2040 plan assumes its further expansion. These efforts are aimed at creating a balanced system where trams, buses, and other modes of transport work as a single whole.
❓ Frequently Asked Questions (FAQ): Transport Projects in Antalya
The airport's annual capacity has already increased from 35 million to 82 million passengers. By 2040, with the opening of the new T3 terminal, capacity will exceed 80 million passengers per year.
While the projects are in the planning stages, they face significant challenges due to the Taurus Mountains. There is no confirmed date yet, but experts expect progress in the next decade.
It is the Urban Transport Master Plan for Antalya. It focuses on creating rapid transit corridors, developing transfer hubs, and improving cycling and pedestrian infrastructure to reduce traffic congestion.
AntRay is Antalya's existing tram network, currently consisting of two lines that connect the city center with the airport and the eastern districts. It is a key part of the city's public transport system.
Increased passenger traffic boosts tourism and business, which in turn increases demand for rental housing and stimulates infrastructure development in areas adjacent to the airport and along new transport routes.
In 2025, the airport served a record 39.1 million passengers, and 2026 is expected to see a new peak.
The main obstacle is the Taurus Mountains, which create extremely difficult conditions for railway construction. This has historically prevented the return of rail service to the region.
They are high-capacity rapid transit corridors (light rail or metrobus) designed to handle the main passenger flows on the city's busiest routes, similar to a backbone system.
Yes, the third phase of expansion includes the construction of a new international terminal T3 with an area of about 70,000 m², planned for 2038–2039.
Improved transport links and growing passenger traffic increase the region's attractiveness for tourism, business, and residential investment, creating opportunities for property value growth and rental income.
Related Articles
What Will Antalya Look Like by 2030?
Population growth, high-speed trains, year-round tourism, new investments, and environmental challenges.
Read more →What Will Antalya Airport Look Like in the Coming Years?
Learn about the €850M+ renovation, new terminals, solar power, seasonality challenges, and what it means for investors.
Read more →Why Do People Live Longer in Turkey?
Discover 7 key factors: Mediterranean diet, climate, social bonds, healthcare, and the philosophy of "keyif."
Read more →RESTPROPERTY SINCE 2003
Real estate, relocation, and transaction support as a unified system
RestProperty has been working with foreign property buyers since 2003. The company's specialists help not just choose an apartment, but determine which property matches the client's goal: permanent living, residence permit, citizenship, rental, or capital preservation.
Support includes property selection, document verification, cost calculation, arrangement of banking operations, Tapu registration, and after-sales service.
Conclusion
Antalya's future directly depends on the success of its transport projects. The city is already making huge strides forward: the airport is turning into a global hub, and city authorities are laying the foundation for a modern public transport system. The main challenge for the future is the implementation of rail projects, which, if successful, will finally connect Antalya with the rest of the country and open a new chapter in its economic and tourism development.
The material is based on data from the airport operator (Fraport TAV), government agencies (DHMI), and reports from the Antalya municipality. Information is current as of July 2026.